Nortel-networks NN43001-563 Manuale Utente Pagina 94

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 93
94 ITG engineering guidelines
Figure 24
IP Trunk 3.01 (and later) network engineering process
Three preliminary steps must be undertaken.
1. Calculate IP Trunk 3.01 (and later) traffic. Estimate the amount of
traffic that the system will route through the IP Trunk 3.01 (and later)
network. This total must include the estimated traffic between the IP
trunk cards and the Signaling Server. This in turn places a traffic load
on the corporate intranet. This is described in "IP Trunk 3.01 (and later)
traffic engineering" (page 95).
Nortel Communication Server 1000
IP Trunk Fundamentals
NN43001-563 01.01 Standard
Release 5.0 30 May 2007
Copyright © 2007, Nortel Networks
.
Vedere la pagina 93
1 2 ... 89 90 91 92 93 94 95 96 97 98 99 ... 489 490

Commenti su questo manuale

Nessun commento